Customers

Pascua Lama In-Plant Belts

Project Year: 2010

Project that is being done this year includes engineering, design, manufacturing, supply and commissioning of 18 belts, with width of 18”, 30” and 42 ”.

Dolores Correa Project

Project Year: 2010

Provided diagnosis and simulation of existing chutes and belts, using three-dimensional ”DEM” modeling on existing chutes and improved chutes modeling to ensure continuous flow of material, less abrasive wear and less segregation.