Fact Sheet: Crusher and Emergency Tunnel Project

Name:
Crusher and Emergency Tunnel Project
Customer:
Guacolda
Location:
Chile
Year:
2009
Long:
104 m
Capacity:
720 TMPH
Motor Power:
150 HP
Project Description:

Provided civil engineering works, supply and installation of corrugated galvanized steel pipe for an underground emergency tunnel. Additionally, also provided engineering, design, manufacturing of structures, mechanical and electrical supply, erection and commissioning of a coal roller crusher, including a bypass to the existing conveyor system. Length: 104 meters. Diameter: 2.43 meters. Installed power: 150 HP. Crusher capacity: 720 TMPH. Maximum size of material: 2".