Fact Sheet: Crusher and Emergency Tunnel Project
- Name:
- Crusher and Emergency Tunnel Project
- Customer:
- Guacolda
- Location:
- Chile
- Year:
- 2009
- Long:
- 104 m
- Capacity:
- 720 TMPH
- Motor Power:
- 150 HP
- Project Description:
Provided civil engineering works, supply and installation of corrugated galvanized steel pipe for an underground emergency tunnel. Additionally, also provided engineering, design, manufacturing of structures, mechanical and electrical supply, erection and commissioning of a coal roller crusher, including a bypass to the existing conveyor system. Length: 104 meters. Diameter: 2.43 meters. Installed power: 150 HP. Crusher capacity: 720 TMPH. Maximum size of material: 2".