Fact Sheet: Los Pelambres Operation Optimization

Name:
Los Pelambres Operation Optimization
Customer:
Minera Los Pelambres
Location:
Chile
Year:
2003
Width:
36", 48" and 54"
Capacity:
850 - 2,580 TMPH
Speed:
0.37 - 2.3 M/s
Project Description:

 

Provided engineering, design, manufacturing, supply, construction and supervision of mechanical and structural installation of eight belt conveyors, of which four are 48” in width, each having a capacity of 1,630 TMPH, speed of 2 m/s, to handle crushed pebbles; two are 54” in width with a capacity of 2,580 TMPH, and two are 36” in width with a capacity of 850 TMPH. Also provided wa a feeder belt of 48” in width with a capacity of 850 TMPH and speed of 0.37 m/s, as well as a 30-ton structure of a transfer tower.

 

STM All rights reserved

LatinoMinería Minería Chilena Certificación ISO 9001:2008 número 39654 Diseño Web

SEO Links: