Fact Sheet: Los Pelambres Operation Optimization
- Name:
- Los Pelambres Operation Optimization
- Customer:
- Minera Los Pelambres
- Location:
- Chile
- Year:
- 2003
- Width:
- 36", 48" and 54"
- Capacity:
- 850 - 2,580 TMPH
- Speed:
- 0.37 - 2.3 M/s
- Project Description:
Provided engineering, design, manufacturing, supply, construction and supervision of mechanical and structural installation of eight belt conveyors, of which four are 48” in width, each having a capacity of 1,630 TMPH, speed of 2 m/s, to handle crushed pebbles; two are 54” in width with a capacity of 2,580 TMPH, and two are 36” in width with a capacity of 850 TMPH. Also provided wa a feeder belt of 48” in width with a capacity of 850 TMPH and speed of 0.37 m/s, as well as a 30-ton structure of a transfer tower.






All rights reserved


