Fact Sheet: Minerals Processing Project (PTMP)

Name:
Minerals Processing Project (PTMP)
Customer:
Codelco
Location:
Chile
Year:
2005
Long:
582, 1,053 and 2,069 m
Width:
42", 54" and 84"
Capacity:
2,584 TMPH
Motor Power:
4,160 HP
Project Description:

Provided engineering, manufacturing, supply and supervision of implementation of a set of 28 conveyors with a capacity of 2,584 TMPH, with metric weights, metal detectors, variable frequency drives (VFD), transfer towers and spare parts. Three overland conveyors of 42” in width, one of which is 2,067 m long; 11 belt conveyors of 42” in width, three of which with automated trippers; 14 feeders of 54” and 84” in width, two of which with casters to allow maintenance of the crusher.

STM All rights reserved

LatinoMinería Minería Chilena Certificación ISO 9001:2008 número 39654 Diseño Web

SEO Links: